Request an offer

Coal & bulk commodities · Mumbai, India

Beyond
boundaries.

Where connections create ventures.

We source thermal and bituminous coal from the world’s leading origins and deliver it to the industries that run on it, with the quality guaranteed in the contract, not just promised.

● Coal and diamond are the same element. Only the arrangement differs.

Who we are

Connecting the world’s coal with the industry that runs on it. Every cargo backed by independent inspection, secure bank instruments and one accountable team, from the first enquiry to the final discharge.

Our story, vision & founders
5+

Sourcing origins

Indonesia, South Africa, Russia, Kazakhstan, Australia & more

3

Incoterms

FOB · CFR · CIF to any major discharge port

100%

Independently inspected

SGS, Intertek or Bureau Veritas at the load port

24h

Response to every enquiry

Founder-led, with firm offers within days

Sourcing & markets

From the mine to your boiler.

Under two weeks by sea from Kalimantan to India’s west coast. We match the right origin to your boiler and your budget, then manage every mile in between.

Where we source & supply
Beyonex trade lanes: coal from Indonesia, South Africa, Russia and Kazakhstan to India, Bangladesh, South-East Asia, the UAE and Türkiye.IndonesiaKalimantan · GAR 3,800–6,300South AfricaRichards Bay · RB1–RB3RussiaBlack Sea ports · NAR 5,500–6,300KazakhstanEkibastuz · by rail to portIndia · West coastMundra · Kandla · NavlakhiIndia · East coastParadip · KrishnapatnamBangladeshChattogramSouth-East AsiaVietnam · PhilippinesUAE & Middle EastFujairah · Gulf portsTürkiyeIskenderun · Marmara
Sourcing originMarket we supplySea laneRail to port

Why Beyonex

We sell the certificate, not just the coal.

Most buyers are sold “typical” specifications. We guarantee a minimum calorific value on the invoice, verified by an independent surveyor, with the price adjusting if it falls short and your right to reject below a floor.

How we bridge the gap

On a typical GAR 4,200 lot

Hidden shortfall risk you carry today~₹385/t
Cost of an independent analysis~₹20/t

A 300 kcal shortfall on GAR 4,200 coal is about 7% of your fuel spend, invisible on every load. Illustrative figures for a 1,000 t lot.

How we work

From enquiry to discharge.

01

Enquiry & KYC

You share grade, volume, port and terms. Both sides complete KYC.

02

Firm offer

We issue a firm offer with price, specification and shipping schedule.

03

LOI / ICPO

The buyer confirms intent. We align terms with the origin supplier.

04

Contract

A sales & purchase agreement with quality and penalty clauses.

05

LC opened

Payment secured through a first-class bank instrument.

06

Load & inspect

Independent sampling, analysis and draught survey at the load port.

07

Shipment

The vessel sails. Full document set issued. Live voyage updates.

08

Discharge

Discharge-port survey and final settlement. Next lifting scheduled.

The Beyonex promise

“Right coal. Right specification. Right landed price. Every time.”